NaaS HK 提供 EHSS 項目專業諮詢服務
Electric vehicle charging system recommendations
Estate managers/corporations are welcome to inquire for details
- Dedicated personnel to follow up on parking lot charging system maintenance needs
- Full-time licensed electrical engineer responsible for system design and supply
- Energy efficiency assessments
- We can provide one-stopEnergy management system services
- 優化充電速度
- 國際電工委員會 (IEC) 標準
- 強大後台技術系統
- EV 屋苑充電易資助計劃承建商名冊
- 電力負荷管理系統
- 註冊電業承辦商
EV-charging at Home Subsidy Scheme (EHSS) SOP
Site inspection/design
- Arrange staff from the engineering department and marketing department to go to the site to take photos and understand the factory conditions
- Arrange for the initial marketing staff to understand the bidding documents
- Engineering staff will provide technical advice when necessary
- Determine participation in bidding and its strategies
- Space line planning involved in the design
List the bill of quantities for the design:
- switchboard
- switch panel
- Corresponding components included in switchboard and switch panel
Measure the required lengths involved in the parking spaces included in the corresponding design
- length
- Main trunking/brackets
- Branch trunking and/brackets
- pipe
Construction revision
Design
- On-site inspection, if there are any modifications, a plan must be sorted out as soon as possible
Engineering
- Preliminarily discuss the work process with the contractor
- Discuss vehicle arrangements with the management office
Materials
- Determine the overall delivery date of relevant materials
Project preparation
Procurement and transportation arrangements
- quantity
- Time
- Receiving arrangements
Process arrangement
Engineering construction overall flow chart
When the control part involves power outage, we need to submit an application with CLP or HK Electric
Mobilization of public parking spaces and private parking spaces
System testing
Project document preparation
- Material document
- Construction pla
- Safety Planning (Worksite Environment/Worker Health)
Construction
- Switchboard modification during power outage
- Laying trunking
- Laying wires
- Electrical control panel
- Weekly report
- Safety equipment
- Monitor progress
-
switchboard
Blackout, arrangements, measurements
-
Laying trunking
-
Laying
-
Electrical control panel
-
Weekly report
-
Control
System
- Earth Loop Impedance Test
- Meggar Test
- RCBO Tripping Time Test
LVSB
- FAT
- SAT
- TRT
- WR1
As-built drawing
- Monthly report
- Fire emergency switch operation demonstration
- Analyzer operation demonstration
- Maintenance manual
-
掣櫃測試
-
System testing
-
完工及測試文件